Second in the list of the flyover Projects was the Benniganahalli Structure. Built on 477 pile Foundations in a lake, it is Speacially designed to withstand Seismic forces. The deepest pile is Anchored at a dept of 30 mts.
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment