The project has been entrusted to M/s. Simplex Concrete Piles (I) Ltd. at a contract value of Rs. 2760.00 lakhs with the scheduled date of completion as 14.11. 2005. The work comprises of a main flyover from Khoday's circle along Sheshadri road for a total of 646.00 mts. with a 14 mts. width unidirectional carriageway and a loop towards Race Course side for a length of 258.00 mts. with a unidirectional 7.5 mts. wide carriageway Grade Level service roads for free turn towards Sheshadripuram is planned.
Land to an extent of 1870 sqm. needs to be acquired from Bangalore Turf Club premises. Government directions to the Turf Club Authorities may need to be issued for handing over of the said land to enable completion of the project at this crucial junction in time. The work comprises of 5 lane undivided one way flyover up to Anandarao Circle with a 2 lane one way down ramp towards Basaveshwara Circle and 4 lane one way flyover along Sheshadri Road crossing Anandarao Circle & Subbanna Circle.
Total Length of Fly-Over
804.60 m
Obligatory span
At Ananda Rao Circle 40.00 m (Cost-in-situ Superstructure)
At Subbanna Circle 49.00 m (Cost-in-situ Superstructure)
Width of Carriageway
Khoday Circle upramp upto Ananda Rao Circle : 17.5 m
Ananda Rao Circle to the end of flyover (Towards Maharani's College) : 14.0 m